Evaluating Chinese Data Vendors: Completeness Tests

Evaluating a Chinese data vendor on completeness means testing, on measured samples, whether the delivered record set contains everything the buyer’s use case needs, rather than accepting a coverage claim from the proposal. The vendor due diligence process follows five tests: source coverage against the target inventory, field completeness on a fixed hand-collected sample, missing-record detection against source publication, duplicate and entity-alignment quality, and historical depth with time-gap review. Each test produces a number the buyer can compare across vendors and carry into the contract. This article describes how to run those tests for a web scraper-based or API-based vendor supplying public market, directory, and procurement tenders data, and it treats completeness as a measurable property of the pilot, not a promise in the sales deck.

What completeness means for a vendor data set

Completeness breaks into four separate questions that vendors often collapse into one “full coverage” statement. Source completeness asks whether every source the buyer needs is actually in the feed. Record completeness asks whether every record published on those sources reaches the feed. Field completeness asks whether the required fields inside each record are populated rather than null. Historical completeness asks whether the date range available matches the buyer’s analysis window. A vendor can be strong on one and weak on another, and the tests above separate them.

The tests need a fixed reference built by or for the buyer, not by the vendor. A reference collected from the vendor’s own feed cannot detect the vendor’s own gaps. The reference should come from direct review of the public source on fixed dates: pages or bulletins the buyer collects by hand, with the required fields written onto a worksheet. Sample size should be large enough to surface a real error rate: roughly fifty records per source for field checks, plus a longer window for missing-record detection. Samples drawn from the vendor’s best-performing source do not represent the full program.

Completeness results should be reported by source, not averaged into one program figure. Averaging hides a weak source behind two strong ones, and the weak source is usually the one the buyer cares most about. The due diligence record keeps per-source scores alongside the overall summary, so later delivery can be checked against the same baseline.

Test one: source coverage check against the target inventory

The first test compares the vendor’s source list to the buyer’s target inventory, source by source. Each inventory entry is marked covered, partially covered, or missing. Partial coverage needs a reason: the vendor collects only a subset of sections, only certain notice types, or only recent records. For procurement tenders programs, this check separates vendors who track national bulletins from those who also cover provincial platforms and large purchaser own websites, which often hold the notices the general feed misses.

The check should also confirm how each source is collected: official feed, aggregator, or direct collection. That distinction affects maintenance risk, field depth, and the vendor’s ability to explain a missing record. The buyer should ask the vendor to mark any field or record that comes from a secondary source rather than the original publication, so inferred or estimated data does not read as copied data. A coverage table that lists category labels instead of named sources fails this test, because a category can be claimed through one shallow directory.

Source inventory for the buyer’s own program should be revisited during the diligence phase itself: a source the buyer initially omitted may matter once the workflow is scoped, and a source the vendor cannot cover should either be substituted through an official channel or removed from the requirements. The final inventory, after this check, becomes the source baseline for the remaining tests.

Test two: field completeness on a fixed hand-collected sample

The second test samples records on fixed dates and checks required fields against the hand-collected reference. For each sample record, the worksheet lists the required field: purchaser, project title, category, budget, deadline, bidder, award amount, and source link where applicable. The vendor feed is compared field by field, and each match, mismatch, null, and extra value is recorded. The field-completeness rate is the share of required fields populated with values that match the reference.

Null fields are split into two kinds: a field the source itself did not publish, and a field the source published but the feed failed to carry. The first is a source limitation, not a vendor defect; the second is an extraction gap. Keeping the two apart prevents the vendor from hiding extraction failures behind source omissions, and it tells the buyer which gaps are fixable in maintenance. Derived fields, such as a category assigned from title keywords, are scored separately from copied fields, so inference quality does not inflate the copied-field score.

Sample results should be reviewed for systematic patterns: a particular source missing the budget field, a particular document type returning null addresses, or scanned attachments losing numbers more often than digital pages. Patterns point to parser or OCR weaknesses that would recur across the whole set. The validation checks that surface type errors, required-field gaps, and cross-field inconsistencies are laid out in validation pipelines for extracted records, and the vendor’s own pipeline should expose the equivalent checks rather than relying on the buyer’s sample review alone.

Test three: missing-record detection against source publication

The third test looks for records the source published but the feed never carried. Over a chosen window, the buyer enumerates records from the source publication, then checks each against the feed. Records present in the source but absent from the feed are missing records; the missing-record rate is their share of the source window. This test catches the failure that field checks cannot see: an entire record omitted because a list page was skipped, a search form parameter was not handled, or the source changed its list structure.

The window should be long enough to cover a normal working week and any known peak, and it should include weekend or holiday periods where publication schedules differ. Missing records should be traced to a cause where possible: source outage, pagination skip, throttle, parser break, or a coverage gap the vendor never admitted. Cause tracing tells the buyer whether the gap is a transient incident or a structural limitation of the vendor’s collection. Reliability symptoms and retry behavior in collector systems are reviewed in failure rates and retries in scraper bots, and the pilot should show how the vendor detects and reports silent gaps rather than assuming an empty feed means an empty source.

Missing-record detection also checks duplicates within the feed: the same record arriving twice in one run from retries or overlapping list pages. Exact repeats are easy to suppress; their rate still signals queue and restart issues that may grow under peak volume. The buyer should ask whether duplicates are removed before delivery or left for the consuming system to handle.

Test four: duplicate and alignment check on matched entities

The fourth test examines entity quality: whether the same organization or record is recognized as one across sources and refresh cycles. A sample of entities appearing in more than one source or more than one cycle is matched manually as the reference, then compared to the vendor’s merged records. Two failure directions show up: over-merging, where two similarly named entities are collapsed into one record, and under-merging, where one entity appears under duplicate records across cycles.

Over-merging corrupts every downstream concentration, share, and comparison figure; under-merging inflates counts and splits supplier histories. The alignment record should show the match basis and a confidence note, and unmatched entities should go to a review list rather than being force-merged. The buyer should check what identifier the vendor uses: source-native identifiers where available, derived combinations otherwise, and how name variants and address abbreviations are normalized. A vendor that cannot explain its matching rules cannot explain its duplicate rate.

Identifier stability across refreshes matters for time-series work. If record identifiers restart with each export, joining this month’s set to last month’s requires entity matching every cycle; if stable identifiers are retained, trend analysis stays straightforward. This property should be confirmed on two consecutive refreshes rather than assumed from a single snapshot.

Test five: historical depth and time-gap review

The fifth test checks how far back the dataset reaches and whether that history is continuous. The buyer states the analysis window, for example three years of tender awards, and the vendor provides the date range per source. Gaps inside the range matter as much as the start date: a feed that covers the last two years but skips one quarter in the middle cannot support trend analysis across that period. The history should be sampled at several points to confirm records exist and fields are populated, not only at the most recent date.

Historical depth often differs between sources within one vendor catalog. The deepest source’s history should not be quoted as the catalog-wide range; per-source date ranges should be listed. Where the buyer needs history the vendor does not hold, alternatives include purchasing an archive snapshot or building the early period from the buyer’s own collection, and the cost of those alternatives should be priced into the comparison.

Scoring the results and turning gaps into contract terms

After the five tests, each vendor scores per source on source coverage, field completeness, missing-record rate, alignment quality, and historical depth, with agreed thresholds for pass and watch. The thresholds should match the use case: a deadline-sensitive procurement watch needs a low missing-record rate; a one-time market sizing can tolerate more field nulls in secondary sources. The scorecard keeps the reference worksheet and the sample dates attached, so later delivery can be retested against the same baseline.

Findings that matter should become written contract terms: sources the vendor commits to cover, fields committed per source, measured completeness thresholds, the reporting cadence for gap detection, and the remedy when a source underperforms. Exit and export terms follow the same review: what accumulated records the buyer can take on departure, and whether the schema and matching rules travel with the export. Vendor timelines for delivery and repair are another diligence dimension, covered in development timelines for Chinese scraper teams, and they should be assessed alongside the completeness scores rather than after selection. A vendor that scores well on the pilot but refuses to commit the results to terms should be treated as having shown its capability without committing to repeat it.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *